Three Projects, Three Lessons: Sydney Trains, a SCEC Upgrade and CSIRO's Mobile MOC

Three Argent projects (Sydney Trains, a SCEC cable entry upgrade and CSIRO's Mobile MOC) and what they teach about specifying racks.

22 November 2026
4 min read
0 views
Three Projects, Three Lessons: Sydney Trains, a SCEC Upgrade and CSIRO's Mobile MOC

Case studies are useful when they teach something beyond "the customer was happy". Here are three Argent projects, each with a lesson for anyone spec­i­fy­ing racks for critical en­vi­ron­ments.

Project 1: Sydney Trains' Rail Op­er­a­tions Centre

Sydney Trains runs rail services across met­ro­pol­i­tan Sydney, bounded by Berowra, Emu Plains, Macarthur and Waterfall. It maintains tracks, trains, signals, overhead wiring, stations and fa­cil­i­ties, and supports NSW TrainLink in­fra­struc­ture. Its Rail Op­er­a­tions Centre (ROC) oversees all rail movements in its area.

Argent server racks, man­u­fac­tured in Sydney, support Sydney Trains' ICT systems. Features high­light­ed in the project include Argent's ISO 9001 third-party audited quality system, factory QA testing before shipment and the in-post PDU, which mounts power within the rack post to free space for equipment (read more).

Lesson: integrate before you man­u­fac­ture

Sydney Trains could work with Argent's engineers and designers before man­u­fac­tur­ing began, tailoring racks to integrate with existing setups without dis­rup­tion or downtime. For op­er­a­tional en­vi­ron­ments, that early col­lab­o­ra­tion is where risk is removed.

Project 2: A SCEC rack that needed 18 cable entries

A client had ordered a security rack with eight standard SCEC cable entry ports and baffles. During in­stal­la­tion it became clear that the rack, intended for patching, needed much more cable entry capacity through the top. In a SCEC rack, that's a sig­nif­i­cant challenge. As the in­stal­la­tion con­trac­tor explained: "Our client is a defense con­trac­tor and each rack has to meet a certain security re­quire­ment, so we can't just drill extra holes in by ourselves."

Over a Zoom meeting, Argent, the installer and the security client agreed the re­quire­ments. Argent turned around a SCEC-compliant cable entry baffle design within 24 hours, providing 18 cable entry ports. Drawings and 3D models allowed sign-off before any change was made. The rack was then modified in the factory within a few days and returned (read more). The work was done at the Wilson & Gilkes factory, before Argent joined OPIE.

Lesson: plan cable entry early, and choose a supplier who can respond

Cable entry is the most common reason security racks need rework. Specify entries gen­er­ous­ly at design stage. And choose a man­u­fac­tur­er whose designers and factory can respond in days, not months.

Project 3: CSIRO's Mobile Mission Op­er­a­tions Centre

CSIRO's Mobile Mission Op­er­a­tions Centre (MOC), built at Varley's Brisbane facility, is a mobile op­er­a­tions centre for space missions. It needed racks that could withstand vibration, shock and rapid setup cycles, while giving full access to equipment in a confined space.

Argent's Senior Design Engineer at OPIE Man­u­fac­tur­ing Group, Humberto Mesa, explained: "We took one of our existing, popular, and high-per­for­mance Argent rack designs and re-en­gi­neered it to create a bespoke version for CSIRO." The racks gained shock-absorbing mounts for truck mounting and an improved pull-out and rotation mechanism. CSIRO's Mark Dunn noted that the racks "pull all the way out and spin so that you've got easy access to both the front and the rear" (read more).

Lesson: adapt proven designs

Custom doesn't have to mean starting from scratch. Adapting a proven, high-volume design reduces risk, cost and lead time, while still meeting unusual re­quire­ments.

What connects them

Each project relied on the same strengths:

  • En­gi­neer­ing access: clients worked directly with the people designing their racks.
  • Local man­u­fac­tur­ing: design changes could be made and built quickly in Sydney.
  • Quality systems: ISO 9001:2015 cer­ti­fi­ca­tion and factory QA.
  • Security know-how: decades of SCEC ex­pe­ri­ence.

Today Argent racks are made at OPIE Man­u­fac­tur­ing Group's Emu Heights facility, with the group's au­toma­tion and in-house powder coating behind them.

Fre­quent­ly asked questions

Can Argent customise a standard rack for my project? Yes. Adapting a standard design is often the fastest, lowest-risk way to meet unusual re­quire­ments.

Does Argent supply racks for mobile or vehicle-mounted ap­pli­ca­tions? The CSIRO MOC racks were adapted with shock-absorbing mounts for truck mounting. Talk to us about your re­quire­ments.

How quickly can Argent respond to a design change? It depends on the change. In one SCEC project, a compliant design was produced within 24 hours and the mod­i­fi­ca­tion completed within a few days.

Where are Argent racks made today? At OPIE Man­u­fac­tur­ing Group's Emu Heights facility in Western Sydney.

Have a project with unusual re­quire­ments? Talk to Argent or browse the product range.